project server error
project has detected incompatible codepages
all project2003 server+sql2k+win2k3 are in the correct code page. all db
were created in correct codepage too
the only problem i found was that the share point db were created in EN,
also it was impossible to chabe the default codepage during sharepoint
installation.
the problem is that when PC has EN as a defaul lang everything is OK,
but i need tha local lang. to work with project server.
is there any sollution?
thanx